Jump to content

Search the Community

Showing results for tags 'workflow task'.



More search options

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • CA Service Desk Manager
    • General Discussions
    • Customizations / Modifications
    • Bugs / Errors / Patches
    • Knowledge Tools / Keyword Search
    • Support Automation
    • CMDB
    • Install / Migrate / Configure
    • Product Integration
    • Reporting
    • Workflow
  • Nimsoft Service Desk
    • General
  • General
    • Wiki Article Discussions
    • ITIL & Best Practices
    • Speak Out
    • Employment Opportunities

Categories

  • Getting Started
  • Installation
  • Configuration
  • Customization
  • Integration
    • CA Applications
    • Non-CA Applications
    • Custom Integrations
  • Reporting
  • Miscellaneous

Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


AIM


MSN


Website URL


ICQ


Yahoo


Jabber


Skype


Location


Interests

Found 5 results

  1. Hi All I'm trying to enhance the Change Workflow tasks "CAB CONSOLE" (orderwf_approval_console.htmpl) view by wanting to add a tab/s to show the attachments and property questions and answers/values for a change When I just indicate <PDM_MACRO name=tab title="Attachments1" height=300 id=attmnt src="xx_attmnt_tab.htmpl"> it shows all attachments, I need some help with the src="????" part of the requirement to show associated attachments and another tab to show associated properties for the specific change order being viewed. In 'detail_chg.html' it is displayed as ... <PDM_MACRO name=tab title="Attachments" height=300 id=attmnt src="OP=SHOW_DETAIL+HTMPL=xx_attmnt_tab.htmpl+FACTORY=chg+PERSID=$args.persistent_id+NO_DP=yes"> But this does not work. Using WF also not, I need to build the relationship If at all possible, does anybody have a knowledge document on how to construct these, to understand and be able to build future requirements. Can anybody please help. Thank you Jacques
  2. Hi guys, I have this scenario on my enviroment: On the task 1, if the status is APP then the two next tasks should be canceled or skipped. If the status on the 1st task is APP2 then the next task should be pending and the third one should be waiting. How can I create a action macro to this behavior? (Object = Request Workflow Task).
  3. Hi guys, I have this scenario on my enviroment: On the task 1, if the status is APP then the two next tasks should be canceled or skipped. If the status on the 1st task is APP2 then the next task should be pending and the third one should be waiting. How can I create a action macro to this behavior? (Object = Request Workflow Task).
  4. Hello Collaborators, I am trying to add an aditional workflow task in an already existing change order which one it has some workflow tasks using add_workflow method in spel code. This is my first time working with this method and I did this: 1) First, I wrote this line: send_wait(0, top_object(), "call_attr", "api", "add_workflow", who, "400401", "", "APP", 0, "group_task", 1, "wf_template", 400208, "description", "Operaciones Argentina"); I got an error message saying: 12/20 11:16:28.43 G100603SV278 spelsrvr 5124 ERROR api.spl 1507 err getting a change order or issue dob: NOT FOUND 2) Taking care the first attempt, I modified the parameter about change order persistent id: send_wait(0, top_object(), "call_attr", "api", "add_workflow", who, "chg:400401", "", "APP", 0, "group_task", 1, "wf_template", 400208, "description", "Operaciones Argentina"); But, in this case, the change order never finishs to save and the logs show: 12/20 11:25:06.52 G100603SV278 domsrvr 8508 ERROR attr.c 6196 No response to trigger chg::ztoma_control (3 time) after 120 seconds; waiting another 240 seconds Can you tell me what is wrong with the persistent id in the method? Thank you!!
  5. Can you help me? I need solve this problem. One of WF tasks must be skipped when affected_contact is member of Group assigned to task. How can I test it in Spel macro which will be started on change Task status to Pending? THX.
×
×
  • Create New...